Heavy Duty Long Leadclip w/Pins & Tailrubber
It.№: 49889
Print

1 from 1

€
5.75
€
Discount period from
01.01.1970
to
01.01.1970
In stock
Delivery
In stock
Send inquiry
Express order
guest checkout !
+359887538666
Order by phone Send inquiry
We will reply in a timely manner Add to Favorites
Your favourite products - pcs: 10
- Last Meter
Rating:
Information
A safe lead clip system for use with extremely heavy leads ideal for big river fishing
• Designed to release the lead should it become snagged
• For use with size 8 swivel
• The metal arm reduces twist, releases easier and is stronger for bigger leads
Details
pcs
10
Feedback