Back to last meter
Out of stock
Heavy Duty Long Leadclip w/Pins & Tailrubber
It.№: 49889
Print


Add to Favorites
Your favourite products
Rating:

Heavy Duty Long Leadclip w/Pins & Tailrubber
Information
A safe lead clip system for use with extremely heavy leads ideal for big river fishing
• Designed to release the lead should it become snagged
• For use with size 8 swivel
• The metal arm reduces twist, releases easier and is stronger for bigger leads
Details
pcs
10
Feedback